INVESTOR VIDEO CONFERENCE CALL

September 8, 2021 at 11:00 AM (EST)

Zoom video call registration link:

https://us06web.zoom.us/webinar/register/WN_b6lO9Yo3TjOlQT9XtJRx1g

Zoom ID:

865 1276 0999

Join by phone using the following dial in:

North America: +1 646 558 8656, UK: +44 203 481 5237, Brazil: +55 11 4680 6788



SUMMARY
  • Sigma Lithium to join NASDAQ
  • Company to present at United Nations High-Level Dialogue for Energy 2021 Transition Conference on Sept. 24 in New York
  • Company on target to begin production in 2022 and achieve net zero carbon emissions ahead of the targets announced by the United Nations for the Decade of Action Against Climate Change
  • Investor call set for Sept. 8 at 11 a.m. EST

VANCOUVER, British Columbia, Sept. 02, 2021 (GLOBE NEWSWIRE) -- SIGMA Lithium Corporation ("Sigma" or the "Company") (TSXV:SGMA) (OTC:SGMLF) is pleased to report that it selected NASDAQ for its dual-listing in the United States and it will join the United Nations High-Level Dialogue on Energy 2021 Transition that will take place in tandem with the General Assembly opening week on September 24 in New York.

The Company is also pleased to announce the significant progress made during the period towards construction of the plant and mine for phase 1 production ("Phase 1 Production") of its Grota do Cirilo's high grade lithium project in Brazil (the "Project").

SELECTION OF NASDAQ FOR DUAL-LISTING

ENVIRONMENTAL, SOCIAL AND GOVERNANCE

PHASE 1 PRE-CONSTRUCTION

The Company has reported unaudited financial and operating results for the second quarter ended June 30, 2021 ("2Q21") including a comprehensive technical, operational and corporate update to August 30, 2021, detailing the significant progress made during the period towards Phase 1 Production of its Project.

Both the financial statements and an MD&A are available on SEDAR (www.sedar.com) and on the Company's corporate website at the following links: https://www.sigmalithiumresources.com/wp-content/uploads/2021/09/Sigma-FS-Q2-2021-Final.pdf and https://www.sigmalithiumresources.com/wp-content/uploads/2021/09/Sigma-MDA-Q2-2021-final.pdf.

Highlights include:

PLANT PRE-CONSTRUCTION

ESG-CENTRIC DEVELOPMENT AND OPERATIONS OF FIRST MINE

CAPEX & BUDGET

PHASE 2 FEASIBILITY STUDY UPDATE

PHASE 3 EXPLORATION & DEVELOPMENT OF OTHER DEPOSITS WITHIN THE PROJECT AREA

CORPORATE SUMMARY UPDATE

COVID-19

ABOUT SIGMA LITHIUM

Sigma is a Canadian company developing, with an environmental sustainably ESG focused strategy, the largest hard rock lithium deposits in the Americas, located in its wholly owned Grota do Cirilo Project in Brazil. The Company has been producing low carbon high purity lithium concentrate at an on-site demonstration pilot plant since 2018. This pilot production has been an important part of the successful commercial strategy of the Company, shipping samples of its low carbon "green & sustainable" high purity lithium to leading global potential customers, for product certification and testing, with the goal of participating in the rapidly expanding electric vehicle ("EV") supply chain.

The Company is in pre-construction and detailed engineering of an environmentally friendly, fully automated, dense media separator ("DMS") production plant, that will apply proprietary algorithms to digitally control the dense media. The production plant will be vertically integrated into the Company's mining operations, exclusively utilizing as feedstock the high purity spodumene ore with exceptional mineralogy from the Project. The production plant will process the spodumene ore into a high purity 6% battery-grade lithium concentrate engineered to the specifications of its customers in the lithium-ion battery supply chain for EVs.

The Company continues to demonstrate its commercial and market relevance by significantly advancing its strategic goals on three fronts: near-term production scheduled for 2022, completing the studies for the viability of production expansion contemplated for 2023, and the determination of the ultimate extent and unique high-purity quality of mineral resources at the Company's wholly-owned Grota do Cirilo Project, all while maintaining its strategic leadership in ESG in the lithium supply chain.

In order to secure a leading position supplying the clean mobility and green energy storage value chains, the Company has adhered consistently to the highest standards of ESG practices, which were established as part of its core purpose at inception in 2012. The production process will be powered by clean energy and the Company will use state-of-the art water recirculation circuits in its processing combined with dry stacking tailings management. The DMS process of the production plant does not utilize hazardous chemicals, as a result its tailings are 100% recyclable into ancillary industries, such as ceramics.

FOR ADDITIONAL INFORMATION PLEASE CONTACT

Daniel Abdo

(Sao Paulo) +55 11 2985-0089

daniel.abdo@sigmaca.com

ir@sigmaca.com

Vitor Ornelas

(Sao Paulo) +55 11 2985-0089

vitor.ornelas@sigmaca.com

LinkedInSigma Lithium
Instagram@sigmalithium
Twitter@SigmaLithium

FORWARD-LOOKING STATEMENTS

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation including statements relating to the ultimate duration, impact and severity of the COVID-19 pandemic (including its impact on financial markets and national and multinational economies generally, and its impact on the growth of the electric vehicle market and other impacts on the demand for lithium products) and other forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. All statements that address future plans, activities, events, or developments that the Company believes, expects or anticipates will or may occur are forward-looking information, including statements regarding the potential development of resources and drilling plans which may or may not occur. Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the ability to complete the Annual Filings and Interim Filings; the market price of the Company's securities, metal prices, exchange rates, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes, litigation risks, failure of plant, equipment or processes to operate as anticipated, accidents, labour disputes, claims and limitations on insurance coverage and other risks of the mining industry, changes in national and local government regulation of mining operations, and regulations and other matters including the COVID-19 pandemic. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law. For more information on the risks, uncertainties and assumptions that could cause our actual results to differ from current expectations, please refer to our public filings available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.



Primary Logo